欧美日韩有码丨欧美三级在线丨欧美成人一区二免费视频小说丨无套内谢少妇在线观看视频丨日韩av片在线看丨国产中文网丨亚洲色欲色欲www在线观看丨亚洲精品久久久久久久久久久捆绑丨成人在线手机版视频丨亚洲精品毛片一区二区三区丨亚洲s久久久久一区二区丨新国产三级在线观看播放丨亚洲第一页综合图片自拍丨大香伊蕉在人线免费视频丨日韩人妻无码精品—专区丨成年人黄国产丨999成人精品视频在线丨亚洲午夜在线播放丨狠狠色婷婷狠狠狠亚洲综合丨久久天天拍天天爱天天躁

Home > News > Detail

Detail

Guangzhou Metro Two New Lines Trial Operation simultaneously

2016-12-29   【 Big  Middle  Small 】   【 Printing 】   【 Close

 On the Dec 28th, 2016, the phase II of Guangzhou Metro line 6 and phase I of Guangzhou Metro line 7 project started the trial operation, the total length of the trial operation is nearly 40 km. CEC has participated in the design work of these two lines. With the operation of these two lines, the total length of Guangzhou Metro has reached to 308.7 km, ranking the 3rdcity in China.

According to the engineering characteristic of these 2 lines, CEC has introduced the track technology of the high speed railway - the track laying basic survey control net (CP III net) into the metro construction, this technology has significant improved the track laying precision, the smoothness and comfort of the metro.